Southeastern Consulting Engineers Logo
Wastewater Treatment Plant Electrical Upgrade 0
Wastewater Treatment Plant Electrical Upgrade 1
Wastewater Treatment Plant Electrical Upgrade 2
Wastewater Treatment Plant Electrical Upgrade 3
Wastewater Treatment Plant Electrical Upgrade 4

Wastewater Treatment Plant Electrical Upgrade

Over half of the money spent by wastewater and water treatment plants are used as part of their utility bills. Our experts assist our clients to determine the optimal investment towards their electrical infrastructure. This strengthens the financial & technological outlook and helps our clients to maintain a safe work environment.

Over 50 years of experience designing power distribution systems for wastewater and water treatments plants, we understand the unique design required for different type of loads, corrosive and hazardous conditions of these installations. Our engineering team is adept at planning maintenance of plant operations which enables us to finish the project with minimum number/ duration of outages required.

Our numerous wastewater/ water treatment facilities electrical design projects include:

Switchgear design low voltage (480V) and medium voltage (4,160 V—25,000V).

Motor control center installation and replacement.

Generator additions and retrofits, standby or peak-shaving.

Code compliance and facility renovation.